All our equipment are tested to meet global benchmarks such as IEC 62271 for high-voltage switchgear and IEEE/ANSI standards where applicable. We provide full type-test reports upon request.
We provide detailed Factory Acceptance Test protocols given the scale of electrical infrastructure. We welcome customers to our facility for live inspections or can provide samples of specific components for material verification.
Yes. Our electrical equipment is customizable based on your site requirements such as urban substation or renewable energy grid.
Standard configurations typically ship within 12 to 15 weeks. However, highly customized or high-voltage projects may take longer depending on component availability. We provide a production timeline at the quotation stage.
Yes. we optimize our supply chain by sourcing raw materials directly and utilizing lean manufacturing process.
We offer a standard 18-month warranty from the date of shipment or 12 months from the date of commissioning. Extended warranty packages are available for long-term infrastructure projects.
Yes. We offer Remote Technical Guidance for your local team or On-site Commissioning where our engineers manage the energization process.
We provide 24/7 technical consultation for emergencies. We also maintain a comprehensive inventory of spare parts during maintenance cycles.
We use heavy-duty, vacuum-sealed IP-rated packaging and reinforced steel-framed crates. For large substations, we use specialized logistics providers experienced in handling Out of Gauge heavy machinery to prevent vibration damage.